Railroad Forums 

  • New Hampshire Central Railroad (NHCR) Discussion

  • Pertaining to all railroading subjects, past and present, in New England
Pertaining to all railroading subjects, past and present, in New England

Moderators: MEC407, NHN503

 #1552216  by NHV 669
 
Round 2 on attempting to remove the rails from Littleton to Wing Road, Bethlehem:

http://www.newhampshirelakesandmountain ... Trail.html
Angel Larcom wrote:
Bureau of Trails Chief Chris Gamache said his goal was to evaluate bids, select a contractor and establish a contract before the Sept. 23 meeting between Governor Sununu and his council. He pointed out that the project deadline had been set for mid-Dec to complete the work before the onset of the snowmobile season.
 #1552497  by NHV 669
 
It would have been done last year, but there weren't available funds to cover the project cost, per our moderator Ian. I'll believe it when I see equipment on site, I work just past the end of track.

The only noted opposition last year, was from a couple on the other end of town, whining about some "right" they hold above others in the area to "walk the trail in peace and quiet from these nasty, loud pollution machines [ATVs]".

Nobody is riding these things at 10pm on the existing trail, and multiple uses have worked together without much issue.
 #1552730  by NHV 669
 
A small bit in today's Caledonian Record relating to a separate ATV issue states that the bids for the project came in much higher than what the state anticipated, and the whole thing will go back out to bid, with the project footprint now only extending to Redington Street (Apthorp Station).
 #1555894  by NHV 669
 
And it appears work has begun; on my 0625 drive to work, I observed that the Industrial Park Road crossing was dug out sometime over the weekend, will have to get some photos later.

Edit: got this at 0900
Attachments:
New End of track
New End of track
20201102_090502.jpg (2 MiB) Viewed 2805 times
 #1556442  by highrail
 
Stopped by Hazens yesterday. Nothing around, but did notice that there were multiple bundles of new ties stockpiled. There were 16 packs, totaling about 400 ties. Some sort of limited tie replacement planned?

Do they have any plans for car storage this year?

Steve
 #1570072  by bigfreight
 
For the first time in well over six months there was some activity on the line this week. Yesterday a Boom truck came south thru town marking and laying the new railroad ties that will be replaced at some point alongside the track.
  • 1
  • 56
  • 57
  • 58
  • 59
  • 60
  • 64