10/30/06 Into Avon shortly after 9 am engines #420 and #425 did a big shuffle of the cars at the Avon yard so they could get the 4 cars out for delivery to Kraft. Then they headed down the Industrial track, made their deliveries and took the empties and departed. There was a large supply of covered hoppers in the yard that have been shuffled and set along the eastern sidetrack further up the yard including splitting the cars for the Driveway to Aldon Manufacturing (they ship by truck).
Greg
Greg
~Greg Graves