Railroad Forums 

  • F40PH-3C overhaul program

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

 #1497385  by CRail
 
It was stated in January's Fiscal Management Control Board meeting that the option for the remaining 26 units will be exercised, meaning all of the stretch F40s will be rebuilt.
 #1498140  by ST214
 
1054 was sighted passing thru Mentor, OH yesterday afternoon.
 #1498838  by MBTA F40PH-2C 1050
 
visually confirmed in Middleboro this morning off of B726, arrived at 8:25AM. The 1054 was left attached to a cut of freight cars on the Middleboro Secondary in yard limits. Was told Mass Coastal will be by in a few hours to pick it up and go to Rochester. ALSO, another F40 is almost ready to come home in a few weeks, and a 3rd just entered the paint booth
 #1499117  by shizzy617
 
I'm eagerly awaiting to see these units in service. Something about the F40 that I can appreciate more than the HSP46. A majority of the trains that I ride with a HSP seem to suffer from some form of mechanical failure. Personally, if the T doesn't make a serious move to aquire a Charger diesel, then at least try to obtain the Genesis locomotives that will hit the market at some point
 #1500044  by trains18
 
Currently 1066 and 1074 are oos, awaiting major engine repairs at BET, yet I saw 1074 sitting in the readville yard attached to switcher GP40-MC 1119. I imagine that they will be sent out next to be rebuilt after 1054 and another rebuilt is tested and accepted into service since they have excersized the remaining option to overhaul 26 additional F40PHM and PH-2C's increasing the total order to 36. Not sure if 1056 or 1062 is part of the order since they are massdot units. However, the original F40's are retired. They are stored in Rochester awaiting the bids to blow torch them (scrap) just like 1009, 1014, and 1016.
 #1500568  by trains18
 
1066 will be next after a couple more rebuilds get accepted to service upon completion of testing since it is major repairs oos just like 1074 was.
Last edited by CRail on Fri Feb 15, 2019 1:45 pm, edited 1 time in total. Reason: Unnecessary quote removed.
  • 1
  • 5
  • 6
  • 7
  • 8
  • 9
  • 69