The temporary Rockford terminal would be the east side CNW depot until a new one (presumably at Main St) gets built. The line east of Belvidere is in a good state of repair. Needs are signaling, the crossover at Big Timber and siding(s). The seven miles west to Rockford needs rail and ballast. This ...