Railroad Forums 

  • Search

  • Search it up!

Search found 1303 matches

 Return to the advanced search

Re: September Report

 by jstolberg ¦  Wed Nov 02, 2016 9:58 pm ¦  Forum: Amtrak ¦  Topic: September Report ¦  Replies: 15 ¦  Views: 3686

For the year, nearly the entire increase in ridership can be attributed to 3 routes, 2 really, and all on the Northeast Corridor. Acela16.png The Acela trains are pretty well maxed out when departing or arriving NYP, so this year they merely held previous gains. Any meaningful growth will await the ...

Re: Viewliner II Delivery/Production

 by jstolberg ¦  Tue Nov 01, 2016 9:38 pm ¦  Forum: Amtrak ¦  Topic: Viewliner II Delivery/Production ¦  Replies: 5073 ¦  Views: 1135702

One lousy diner? https://www.youtube.com/watch?v=IJ_R-G_i4Xk" onclick="window.open(this.href);return false; Actually, that makes sense (especially if the roomette modules don't fit). They started with one of each design (diner, sleeper and bag-dorm). Amtrak gave them a thorough going-over...

Re: Viewliner II Delivery/Production

 by jstolberg ¦  Tue Oct 18, 2016 7:35 pm ¦  Forum: Amtrak ¦  Topic: Viewliner II Delivery/Production ¦  Replies: 5073 ¦  Views: 1135702

DutchRailnut wrote:and were off course, from Viewliner II to Amfleet ??? Really ??
V II, A II, Heritage... Why is it now, in the 21st century, that we are incapable of deploying equipment capable of making something as simple as french toast?

Re: Viewliner II Delivery/Production

 by jstolberg ¦  Fri Oct 14, 2016 1:48 am ¦  Forum: Amtrak ¦  Topic: Viewliner II Delivery/Production ¦  Replies: 5073 ¦  Views: 1135702

Did any of the Heritage diners get put on the LSL during the week that the Silver Meteor has been canceled, or was this an opportunity to shop them for another 184-day inspection and maintenance? If the diners were reassigned to the Lake Shore, that would be a sign that the Viewliner II in-service d...

Re: New Midwest/California Bi-Level Discussion

 by jstolberg ¦  Sat Oct 08, 2016 8:31 am ¦  Forum: Amtrak ¦  Topic: New Midwest/California Bi-Level Discussion ¦  Replies: 602 ¦  Views: 142235

Rehiring workers going to start building parts for the Caltran's (California Department of Transportation) contract in Shop 1 and Shop 3 in the 4th Quarter of this year. Hiring welders right now. http://www.wrex.com/story/33317249/2016/10/Tuesday/nippon-sharyo-rehiring-workers-after-business-climate...

Re: Penn Station Renovation & Expansion & Moynihan Station

 by jstolberg ¦  Sat Oct 01, 2016 12:16 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: Amtrak/LIRR Moynihan Train Hall ¦  Replies: 1198 ¦  Views: 239994

The MSG lightbox idea is a little sterile for me. How about adding a 1500 room hotel, a destination conference center, and nightclubs themed for each of the world's continents somewhere in all that empty volume? You could fit that in and still have plenty of natural light and air.

Re: Acela Replacement and Disposition Discussion

 by jstolberg ¦  Sat Aug 27, 2016 9:58 am ¦  Forum: Amtrak ¦  Topic: Acela Replacement and Disposition Discussion ¦  Replies: 1571 ¦  Views: 295908

The initial jobs list: https://jobsearch.alstom.com/search/?q= ... ction=desc" onclick="window.open(this.href);return false;
Rochester, Hornell, Naperville and other locations.

Re: Lynchburg VA NE Regional (ext. to Roanoke and Bristol)

 by jstolberg ¦  Thu Aug 25, 2016 6:28 am ¦  Forum: Amtrak ¦  Topic: Lynchburg VA NE Regional (ext. to Roanoke and Bristol) ¦  Replies: 1243 ¦  Views: 378788

As a reminder to everyone, the Phase 1 environmental study has concluded that 2 tracks are insufficient; 3 tracks are insufficient; 4 tracks are needed. Phase 2 planning is underway to determine how best to configure those 4 tracks. But as Arlington says, DC DOT has slowed the process down, dividing...

Re: Lynchburg VA NE Regional (ext. to Roanoke and Bristol)

 by jstolberg ¦  Mon Aug 22, 2016 6:03 pm ¦  Forum: Amtrak ¦  Topic: Lynchburg VA NE Regional (ext. to Roanoke and Bristol) ¦  Replies: 1243 ¦  Views: 378788

If the trains can't be connected physically (although I see distributed power on longer freight trains), perhaps they can be connected wirelessly so that the second train heels behind the first. Siemens is already working on the concept. http://w1.siemens.ch/mobility/ch/SiteCollectionDocuments/de/ro...

Re: Lynchburg VA NE Regional (ext. to Roanoke and Bristol)

 by jstolberg ¦  Fri Aug 19, 2016 9:09 pm ¦  Forum: Amtrak ¦  Topic: Lynchburg VA NE Regional (ext. to Roanoke and Bristol) ¦  Replies: 1243 ¦  Views: 378788

I know the slots into NYP are limited, but if Virginia can acquire some 125 mph locomotives and widen the long bridge, are there any slots which will allow passage through Washington without changing locomotives and doing a cross-platform transfer at Philadelphia to a Keystone? Because of the necess...

Re: NEC Future: HSR "High Line", FRA, Amtrak Infrastructure

 by jstolberg ¦  Fri Jul 01, 2016 3:36 am ¦  Forum: Amtrak ¦  Topic: NEC Future: HSR "High Line", FRA, Amtrak Infrastructure Plan ¦  Replies: 1066 ¦  Views: 201076

It sounds like a management decision has been made to pursue following I-95 from Kenyon to Saybrook with 4 tracks rather than build 2 tracks inland and leave 2 tracks on the coast. But while I-95 is straighter than the current NEC right-of-way, it still has many curves that won't support a 220 mph d...

Re: Illinois Amtrak Service

 by jstolberg ¦  Thu Jun 30, 2016 7:12 am ¦  Forum: Amtrak ¦  Topic: Illinois Amtrak Service ¦  Replies: 1610 ¦  Views: 459379

Here are major projects scheduled this year: * New or upgraded passengers stations in Springfield, Lincoln, Joliet, Dwight, Pontiac, Carlinville, Alton and Normal. * Three bridge upgrades in Wilmington and one in Shipman. * Siding reconstruction in Dwight. * New siding construction from Braidwood t...

Re: Illinois Amtrak Service

 by jstolberg ¦  Thu Jun 30, 2016 7:06 am ¦  Forum: Amtrak ¦  Topic: Illinois Amtrak Service ¦  Replies: 1610 ¦  Views: 459379

I did notice work this month on the 8.5 mile Elkhart siding.

Re: UPDATE: FRA issues proposed rules on bidding out LD Rout

 by jstolberg ¦  Sun Jun 26, 2016 4:05 pm ¦  Forum: Amtrak ¦  Topic: FRA issues proposed rules bidding out Long Distance Routes ¦  Replies: 34 ¦  Views: 6259

Just limited to existing service...although

The Sunset East route has never been terminated, merely suspended.
So, I suppose that the State of Florida could offer to run the service for 90% of Amtrak's losses on the thrice per week route in the last full year of service.

Re: UPDATE: FRA issues proposed rules on bidding out LD Rout

 by jstolberg ¦  Thu Jun 23, 2016 7:07 pm ¦  Forum: Amtrak ¦  Topic: FRA issues proposed rules bidding out Long Distance Routes ¦  Replies: 34 ¦  Views: 6259

3-4 switches from ATSF tracks to CB&Q tracks at Galesburg. Both are now part of the BNSF. 7-8 switches to Canadian-Pacific tracks at St. Paul. A BNSF routing would miss Milwaukee. Amtrak also owns the Chicago and New Orleans terminals and could make life difficult on foreign crews just as the Ca...

  • 1
  • 2
  • 3
  • 4
  • 5
  • 87