When the line opened it operated "left handed" on the passing sidings. I was able to visit the system last Saturday night and noticed it operated "right handed" now. Does anyone know why the change of operation was made? I have also read about an extension under construction, but did not see any construction on the downtown end from the current terminus. But it was dark and didn't walk down to the current of the track. Can anyone update me on these changes? And how often do they open car operate? They were running 4 closed cars and they were very packed!
Moderator: Massachusetts Bay Transportation Authority