Railroad Forums 

  • Pedestrian bridge to be built next to Long Bridge

  • Discussion related to DC area passenger rail services from Northern Virginia to Baltimore, MD. Includes Light Rail and Baltimore Subway.
Discussion related to DC area passenger rail services from Northern Virginia to Baltimore, MD. Includes Light Rail and Baltimore Subway.

Moderators: mtuandrew, therock, Robert Paniagua

 #1604565  by davinp
 
The Virginia Passenger Rail Authority announced a $20 million grant from an infrastructure bill signed by the president last year that will used to help fund a new bridge across the Potomac just for bikers and pedestrians. The total cost is $88 million and the rest will be funded by state and local tax money.

The new pedestrian/bike bridge is part of a larger project in which a new railroad bridge will be built next to the century plus old Long Bridge, which goes between Arlington and DC. In addition, the new pedestrian/bike bridge will also be built.

The new railroad bridge is expected to open around 2030, and the Virginia Passenger Rail Authority expects the pedestrian/bike bridge to open either in 2030 or earlier.

https://wjla.com/news/local/virginia-se ... -bridge-dc
 #1604755  by STrRedWolf
 
A flyover animation is not the final design that gets built. The final design is produced when the "as built" drawings are issued. Here's a reminder of how a building is actually built from scratch, according to an actual engineer (Where There's Your Problem Podcast Ep 4, mind the background banter).

I will not be surprised of these get added "in the last minute."
 #1604810  by eolesen
 
Not to mention a safety or security risk. Put a minibridge out there and someone will find a way onto the tracks.....

Sent from my SM-G981U using Tapatalk