DutchRailnut wrote:they were built for and timetable restricted to 100 mph.
despite rumors.
I was going through an old issue of Trains i have (September 1978) and I thought of this thread
From "Arrivals and Departures" pg 14:
G's Plus: With 16 Metroliner cars at GE for remodeling (refurbished interiors) and upgrading (air intakes on the roof), Amtrak has assigned GG1 hauled Amfleet consists to some Metroliner Schedules. Pennsylvania painted GG1 4935 is one of eight G's geared for 110mph that are assigned to these runs"
Ironically enough, the next page has 2 pictures of GG1 Amtrak 920 on fire at Midway on 6/11/78. One pic shows it on track 1 stopped right in the middle of the interlocking with smoke pouring out its carbody, the next picture shows it cut away and parked on the Amboy Secondary and firemen still geared up finishing putting the fire out.
This is a great issue, there is a whole section describing NJDOT commuter operations on various lines, especially the current Hoboken side - the title of the article is
"This can't be Millburn. There's no bar across the street."
" 'Somebody give me 'two' on the train line and we can go' "
Written by Thomas Meehan - that name looks familar, I think that might be a poster here? If so, great article! haha