by ExCon90
From time to time there have been discussions in various forums about single-car movements failing to reliably shunt track circuits in ABS territory. In the 1940's and later the NYS&W operated the ACF Railiners and assorted doodlebugs (the Erie also operated gas-electrics in ABS territory at that time), and I don't remember hearing of any shunting problems with them or the RDCs that succeeded them in the 1950's. Does anyone know whether the NYS&W "streamliners" had any special equipment to ensure shunting? They put in a lot of miles between Paterson Broadway and Granton Jct., and on the Erie east of there.