by Bracdude181
Won’t be long before the end of through freight north of Farmingdale, and freight from South Amboy to Red Bank…
Railroad Forums
Moderator: David
CharlieL wrote: ↑Thu Sep 07, 2023 12:24 pm Looks like the track is now connected all the way through. They tied into the Fairfield Rd crossing some time this morning. Now for ballast, alignment, ballast, rinse and repeat.The punch list is getting pretty short.
In Farmingdale they have put a bunch of rock (not ballast) down, about 50 ft in from Railroad ave extending west (north) where the roadbed for the southern branch of the wye would go. It looked rather swampy there. Next to the stub track leading that way is a bunch of wooden ties.