Railroad Forums 

  • Rockingham Jct.

  • Pertaining to all railroading subjects, past and present, in New England
Pertaining to all railroading subjects, past and present, in New England

Moderators: MEC407, NHN503

 #130828  by musehobo
 
I drive by about once a week and have yet to see anything new being done. They have run electrical power (see the picture) across the road and to the building and boarded up every opening. Also, cleared the brush around the side, or back.

 #130842  by highrail
 
I was at the building on Friday...no new signs of life/activity. There is a for lease sign on it. The power has not been connected. They have run the underground conduit from the pole, but no wires.