Hopefully. So, perhaps moving on, 1. how difficult will the tunnel rebuild be, and 2. will it be capable of having 2 tracks? I thought I'd heard that most of the restoration only includes 1 track, but that was a while ago.
Work is progressing on a small culvert at this time. Once the culvert is in place construction equipment will be able to access the tunnel.
Dcell wrote: ↑Sun May 28, 2023 1:49 pm Work suspended for endangered bat season? https://www.tapinto.net/towns/roxbury/s ... nd-andover