I saw a CSX mow crew working in Harrington Park, NJ today. Looked to me like it was related to the big double-tracking project.
Railroad Forums
Moderator: MBTA F40PH-2C 1050
charlie6017 wrote:Thanks Waldwick!There is always a ton of people on Saturdays there, last weekend there was upwards of 30 there! lol, thats why i went to CP7 with one of my friends, you cant get a good shot with a billion people at CP5, but CP7 theres nobody but the shots actually come out great! Here's the link to my video from Saturday: http://www.youtube.com/watch?v=vhaVeZaa05Q
A number of years ago, Pentrex put out a video called "Conrail Hot Spots" and their version of the eastern part of
Conrail's system had "CP-5" as one of the spots to sit and watch action. Are there still quite a few people that gather
there, or has the paranoia since 9/11 sort of ruined that? If I ever had the opportunity, that's one place I would choose
to visit and take some shots.
Just a curiosity.....thanks!
Charlie
airman00 wrote:I saw a CSX mow crew working in Harrington Park, NJ today. Looked to me like it was related to the big double-tracking project.There was a backhoe and a short section of track alongside the main, just north of the Harriott Ave crossing today.
mainetrain wrote:I didn't see the backhoe but did see the track by Harriot Ave, along with some ties laid out and rails alongside the ties, by the Lafayette Road crossing as well. I guess this area will be double tracked too. I also noticed they have begun making clearence along what was the former 2nd track row. By that I mean grading out the land, clearing brush, spreading out a big load of stones, etc. Should be real interesting!airman00 wrote:I saw a CSX mow crew working in Harrington Park, NJ today. Looked to me like it was related to the big double-tracking project.There was a backhoe and a short section of track alongside the main, just north of the Harriott Ave crossing today.
mainetrain wrote:I didn't hear anything about this area being double tracked. I was thinking they were replacing the crossing tracks.It appears to me that between Harriot ave (in harrington park, NJ for those who don't know the area) and Lafayette road, there is the laying down of a second track. I could be wrong though. Perhaps someone with more info could shed some light on this. But it really looks like ROW work being done on what was the former 2nd track.
Steve F45 wrote:What is the distance between those crossings? I've never heard of any new double track in nj, just in ny state. Maybe they are clearing the area for a work area. They did have a lot of track damage in that area last week from a wheel breaking and then when the train stopped it derailed a few trucks when they tried to break the train to clear the crossings.I didn't know about that incident, but the other day I saw trains basically blasting right thru. And these ties by layfayette ave were laid out almost like there building a second track. There was like 15 or so ties laid out. By harriot ave, a short section of what looks like pre-fab track is there. And again it does look like some leveling out of the land has taken place along the former 2nd track row.