Here are some photos of new bridge construction in the Jordan Narrows for Union Pacific and UTA Frontrunner South. This is interesting because construction must deal with two very different rail operations, and entails extensive movement of one. This is fairly unusual railroad engineering.
www.utahtransit.us/jn1.htm
www.utahtransit.us/jn1.htm