A new switch was installed just north of Wootton St, is in the process of being aligned with the old passing siding to the west of the current active line. Rails and ties were replaced on the old siding about three weeks ago, there has been what appears to be more re-grading on both the siding and the actual spur into the steel facility. As of this morning, the crossover rail sections between the two lines still haven't been installed, I'm assuming that this has been delayed until the siding elevation matches that of the main line.
I'm guessing now, but it looks like the original plan might not have included this new switch, as a lot of the original alignment work is being done over.
Rich