Interesting to note that the photo in that article (which first appeared on November 20) was taken a few months ago, based on the tree foliage. The most recent PRIIA 305 minutes indicate the following update, which was current as of October 31:

"On the Acela replacement:

Trainset 1 is together –power car on both ends.
Trainset 2 is being put together for the NEC.
Tilt testing has been completed and has been or will be submitted to the FRA.
Passenger cars are in the final testing and once complete will be submitted to FRA."

Glad to hear that things are moving along quickly - and would not be surprised to see the first trainset headed to Pueblo in the near future (followed shortly by the NEC-bound set). Would be great to see one of these on the new test track at Hornell!

ThirdRail7
Posts: 4153
Joined: Sat Oct 01, 2011 7:07 pm

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by ThirdRail7 »

The target is Feburary.
I want my road foreman!

gokeefe
Posts: 12295
Joined: Sat Feb 16, 2008 12:28 pm
Location: Winthrop, Maine

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by gokeefe »

Yet again ... Tip of the hat to whoever is managing the drip drip drip PR on this ....

We are now getting updates almost every 30 days on progress and they are rotating the outlets to spread the coverage around.

Notice also the timing of this story which avoids the holiday period "dead zone" for news. Next story should be out sometime around the second week of January ... Question is who will be writing next time?
gokeefe

User avatar
Matt Johnson
Posts: 4244
Joined: Mon Feb 18, 2008 3:57 pm
Location: Hazlet, NJ

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by Matt Johnson »

I'm curious to see if the final product has the aerodynamic cladding to smooth the transition between the tilt coaches and non-tilt, slab sided locomotives, but unfortunately I'm guessing the later renderings indicate that it was deleted from the final design:
You do not have the required permissions to view the files attached to this post.

bostontrainguy
Posts: 1662
Joined: Sun Oct 23, 2011 11:14 am

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by bostontrainguy »

Matt Johnson wrote:
Sat Dec 28, 2019 8:58 pm
I'm curious to see if the final product has the aerodynamic cladding to smooth the transition between the tilt coaches and non-tilt, slab sided locomotives, but unfortunately I'm guessing the later renderings indicate that it was deleted from the final design:
If you watch the videos it appears the power cars tilt too.

https://www.youtube.com/watch?v=pLAx6pND1dg

User avatar
Matt Johnson
Posts: 4244
Joined: Mon Feb 18, 2008 3:57 pm
Location: Hazlet, NJ

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by Matt Johnson »

I believe the original concept video either showed a plan that was later changed or was simply inaccurate, but I'm pretty sure the locomotives are straight up next-gen TGV locomotives without tilt.

ExCon90
Posts: 4610
Joined: Thu Sep 18, 2008 1:22 pm

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by ExCon90 »

At 1:07 it looks like the locomotive is tilting; at 1:17 and 2:22 the sides of the locomotive and the coaches seem to match. Then again, at 1:34 it's headed for Harrisburg--are we going to see them in Keystone service? And at 2:10 Portal Bridge never looked better... A nicely done video.

gokeefe
Posts: 12295
Joined: Sat Feb 16, 2008 12:28 pm
Location: Winthrop, Maine

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by gokeefe »

I hate how much we talk about paint but I have to admit the "post-production" livery looks great.
gokeefe

User avatar
Matt Johnson
Posts: 4244
Joined: Mon Feb 18, 2008 3:57 pm
Location: Hazlet, NJ

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by Matt Johnson »

I agree, I don't think the final Amtrak livery was an improvement. Ah well, I think the first gen Acela is a better looking train but hopefully this one will be better where it really counts.

njt/mnrrbuff
Posts: 3607
Joined: Thu Sep 30, 2004 9:33 pm

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by njt/mnrrbuff »

I hope that the paint scheme is good on the Avelia Liberty Acelas. I also and most importantly hope that the Avelia Liberty Acelas work fine and can last a lot longer than the original Acelas.

east point
Posts: 1395
Joined: Tue Feb 16, 2016 1:50 pm

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by east point »

njt/mnrrbuff wrote:
Sun Dec 29, 2019 6:15 pm
I hope that the paint scheme is good on the Avelia Liberty Acelas. I also and most importantly hope that the Avelia Liberty Acelas work fine and can last a lot longer than the original Acelas.
That may depend on how hard they are run. Once new Hudson tunnels are done and one of the old ones are refurbished more trains will be possible for both Acela-2s and Regionals.

Tadman
Posts: 9810
Joined: Wed Sep 01, 2004 10:21 am

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by Tadman »

The recent pics in Hornell show blue cars with white window band, which looks a bit like the HST125 versions of the Brit MK3 cars in their first iteration. I'm sure it's coincidence, but perhaps a good omen. The Mk3 is comfy and lasted quite some time, certainly longer than the Mk4.
Dig the new rr.net Instagram account: @railroad_dot_net

pbj123
Posts: 49
Joined: Sat Jun 20, 2009 2:43 pm

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by pbj123 »

I sent an inquiry to a railroad publication regarding the tilt system on the new trainsets. As far as they know , the tiltronix tilting system will be used on the power cars.

mcgrath618
Posts: 491
Joined: Tue Jan 31, 2017 12:11 pm

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by mcgrath618 »

Isn't the first trainset due to ship out west soon?

Acela150
Posts: 197
Joined: Wed Feb 12, 2014 12:00 am

Re: Acela II (Avelia Liberty): Design, Production, Delivery, Acceptance

Post by Acela150 »

mcgrath618 wrote:
Tue Jan 21, 2020 12:17 pm
Isn't the first trainset due to ship out west soon?
Yes. About a week ago a P42 and VL diner were spotted enroute to Hornell.