Railroad Forums 

  • Search

  • Search it up!

Search found 242 matches

 Return to the advanced search

Re: Penn Station Emergency Repairs: Trackwork, etc.

 by AlKaLI ¦  Tue Jun 19, 2018 8:20 am ¦  Forum: Amtrak ¦  Topic: Penn Station Emergency Repairs: Trackwork, etc. ¦  Replies: 667 ¦  Views: 178771

Track 19 has chain link barriers on the platform. Will see if repairs have started on this Track as well. I believe this also is direct fixation. Hopefully won't take long.

Re: Penn Station Emergency Repairs: Trackwork, etc.

 by AlKaLI ¦  Tue May 22, 2018 2:24 pm ¦  Forum: Amtrak ¦  Topic: Penn Station Emergency Repairs: Trackwork, etc. ¦  Replies: 667 ¦  Views: 178771

Been away for a week so I don't know exactly when they finished but Track 18 is in service. Yesterday my LIRR train came in on Track 17 and Track 18 was empty. The platform barriers (chain link fencing with tarps to block the view) had been removed. New rail, clips and fasteners could be seen on Tra...

Re: CHFP/FPCH — Cedar Hill, New Haven to Fresh Pond, Queens

 by AlKaLI ¦  Mon May 07, 2018 1:53 pm ¦  Forum: Providence and Worcester Railroad ¦  Topic: CHFP/FPCH — Cedar Hill, New Haven to Fresh Pond, Queens ¦  Replies: 96 ¦  Views: 38271

To wintower: Thanks for the recent posts. You are right that some stone also comes off of CSX to the NY&A. See the attached video. https://www.youtube.com/watch?v=26X_8vzGAkI" onclick="window.open(this.href);return false; Black GACX stubby 3-bay hoppers with a gold circle at mid-car. W...

Re: LIRR #497998

 by AlKaLI ¦  Wed Apr 04, 2018 11:49 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR #497998 ¦  Replies: 23 ¦  Views: 5370

Steve: The boxcars are from left to right -Rock Island, Canadian Pacific, Missouri Pacific, ? , Norfolk and Western; Frisco.All but the N&W car are in traditional boxcar red. This is a good picture for a LIRR modeler. MACTRAXX Thank you, Mike. Actually a great picture. It's all roofwalk, 40' bo...

Re: Unauthorized people on LIRR Tracks

 by AlKaLI ¦  Tue Mar 27, 2018 10:52 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Unauthorized people on LIRR Tracks ¦  Replies: 19 ¦  Views: 5523

My condolences to the Family and the Train crews. From news reports, the person struck by the train (2733 5:08 from Speonk)? was killed. Although it remains to be seen, unfortunately have to agree that it was probably a suicide. I have to count myself lucky. I was on my usual Train 1003 which runs o...

Re: Massapequa and Wantagh Station Renovations

 by AlKaLI ¦  Tue Feb 27, 2018 11:53 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Massapequa and Wantagh Station Renovations ¦  Replies: 290 ¦  Views: 103741

At the Wantagh station this morning, everything was in final prep for the switchover to the newly rebuilt eastern portion of the platform. Unfortunately, no one seemed to have bothered to tell the conductor manning the doors of the 7:10am to Atlantic Terminal, or the conductor failed to read the LI...

Re: Penn Station Emergency Repairs: Trackwork, etc.

 by AlKaLI ¦  Thu Feb 15, 2018 8:21 am ¦  Forum: Amtrak ¦  Topic: Penn Station Emergency Repairs: Trackwork, etc. ¦  Replies: 667 ¦  Views: 178771

Platform Barriers between Tracks 15 & 16 were partially removed as noticed this morning. There is still MOW equipment on the new track but a quick inspection showed that rails and 3rd rail look complete. Protection boards were awaiting installation. Don't know what is needed to "commission&...

Re: Penn Station Emergency Repairs: Trackwork, etc.

 by AlKaLI ¦  Thu Jan 11, 2018 10:15 am ¦  Forum: Amtrak ¦  Topic: Penn Station Emergency Repairs: Trackwork, etc. ¦  Replies: 667 ¦  Views: 178771

Yes. I believe Tracks 18 & 19 are to be done in this round as well. This work will more affect the LIRR. I hope they are not done at the same time.

Re: Penn Station Emergency Repairs: Trackwork, etc.

 by AlKaLI ¦  Wed Jan 10, 2018 11:45 am ¦  Forum: Amtrak ¦  Topic: Penn Station Emergency Repairs: Trackwork, etc. ¦  Replies: 667 ¦  Views: 178771

Repair work for Track 15 in Penn Station started this past Monday, 1-8-18. Last week, the beginnings of platform barriers between Tracks 15 &16 were being constructed. Monday morning saw the barriers completed. Track 15 is not accessible from the platform. My LIRR commute usually sees my trains ...

Re: Montauk Cut-off abandoned

 by AlKaLI ¦  Wed Jan 10, 2018 11:31 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Montauk Cut-off abandoned ¦  Replies: 16 ¦  Views: 7360

Demolition is continuing of the north section of the Cut-off. The concrete ramp paralleling the approaches to (WB) East River tunnel is being broken up and carted away. It appears that the ramp will be demolished all the way to the trestle across the tunnel tracks. @ MADDOG: If you are talking about...

Re: New FPY engine?

 by AlKaLI ¦  Mon Dec 04, 2017 11:11 am ¦  Forum: New York & Atlantic Railway-NYNJ Rail ¦  Topic: New FPY engine? ¦  Replies: 6 ¦  Views: 15038

Could this be a rebuilding/replacement for ex L&I SW1200 #9321? An SW-1200 is 1200 HP.
Isn't the #9321 stored derelict somewhere in Brooklyn?

Re: What's being scrapped?

 by AlKaLI ¦  Mon Nov 27, 2017 2:54 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: What's being scrapped? ¦  Replies: 114 ¦  Views: 38528

Dogbert:

101 is still around. Gregory Rice caught it Brooklyn and in Bushwick fairly recently.
http://www.railpictures.net/photo/627381/" onclick="window.open(this.href);return false;

Shame about the other SW1001s.

Regards, AlKaLI

Re: NYAR Train Sighting Thread

 by AlKaLI ¦  Thu Nov 16, 2017 9:36 am ¦  Forum: New York & Atlantic Railway-NYNJ Rail ¦  Topic: NYAR Train Sighting Thread ¦  Replies: 1593 ¦  Views: 371391

^^ I caught this same train about 2:45 PM that afternoon in Farmingdale. The rear 17 gravel loads were spotted for Posillico. The middle 12 empty CDEX were spotted for loading at Coastal. The two Geeps then backed out of the DEF (heading west) to wait for the mainline switch to be thrown to head eas...

Re: Montauk Cut-off abandoned

 by AlKaLI ¦  Thu Nov 09, 2017 2:38 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Montauk Cut-off abandoned ¦  Replies: 16 ¦  Views: 7360

On my LIRR travel into the city this morning, I noticed an excavator perhaps with a pneumatic jackhammer had started demolishing the Cut-off near the Shop tracks. It was about in the center of the attached Google link just above the entrance to one of the East River tunnels. https://www.google.com/m...

Re: Montauk Cut-off abandoned

 by AlKaLI ¦  Fri Sep 29, 2017 8:25 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Montauk Cut-off abandoned ¦  Replies: 16 ¦  Views: 7360

Dogbert: Sorry if you took my sarcasm the wrong way about the "garden trail". I know it's not yours and thanks for your posts. I always enjoy them. As an update, the excavator this morning was near the top of north Cutoff. Rails and ties have been removed to where it is sitting. No work ha...

  • 1
  • 3
  • 4
  • 5
  • 6
  • 7
  • 17