Railroad Forums 

  • Search

  • Search it up!

Search found 7216 matches

 Return to the advanced search

Re: PTC and Faster Passenger Rail

 by Backshophoss ¦  Sat Feb 06, 2021 12:39 am ¦  Forum: Amtrak ¦  Topic: PTC and Faster Passenger Rail ¦  Replies: 46 ¦  Views: 6746

I-ETMS PTS is an overlay of the wayside signal systems and way more dependant on cell phone towers and sat tracking GPS than ACSES used on the NEC and almost all east coast commuter lines So to raise the speed will still need to upgrade track structure and install cab signals BNSF just might start r...

Re: CSX to acquire Pan Am Railways

 by Backshophoss ¦  Fri Feb 05, 2021 1:01 pm ¦  Forum: Pan Am Railways (formerly Guilford Rail System) ¦  Topic: CSX Acquisition of Pan Am Railways ¦  Replies: 4515 ¦  Views: 843566

With the change of admin in DC there might be a minor delay at STB,still think there's a "poison pill" that's making the "hedge fund goons" BALK.

Re: All Things Cascades incl Vancouver

 by Backshophoss ¦  Fri Feb 05, 2021 10:07 am ¦  Forum: Amtrak ¦  Topic: All Things Cascades incl Vancouver ¦  Replies: 681 ¦  Views: 197263

BNSF has "automated" the Dispatch with something referred to as "Movement planner" tends to screw up GTB's issued to the trip and PTC systems
The entire Seattle Sub is littered with MOW CREWS all over the place.

Re: Locomotive selection for NYA from LIRR, 1997

 by Backshophoss ¦  Fri Feb 05, 2021 1:08 am ¦  Forum: New York & Atlantic Railway-NYNJ Rail ¦  Topic: Locomotive selection for NYA from LIRR, 1997 ¦  Replies: 1 ¦  Views: 847

Most likely what LIRR was willing to "lease" to the contract freight operator at that point in time.

Re: GTI's expansion plans

 by Backshophoss ¦  Fri Feb 05, 2021 1:05 am ¦  Forum: Pan Am Railways (formerly Guilford Rail System) ¦  Topic: GTI's expansion plans ¦  Replies: 31 ¦  Views: 7142

he SPLIT of CR to CSX and NS was a shock to Guilford,a possible split of PAR/PAS with the "hung up "sale to CSX is another shock to Guilford.

Re: CSX to acquire Pan Am Railways

 by Backshophoss ¦  Fri Feb 05, 2021 12:59 am ¦  Forum: Pan Am Railways (formerly Guilford Rail System) ¦  Topic: CSX Acquisition of Pan Am Railways ¦  Replies: 4515 ¦  Views: 843566

There must be a "Poison Pill" that makes CSX BALK

Re: North Coast Hiawatha Study

 by Backshophoss ¦  Fri Feb 05, 2021 12:48 am ¦  Forum: Amtrak ¦  Topic: North Coast Hiawatha - Big Sky Passenger Rail Authority (BSPRA) ¦  Replies: 472 ¦  Views: 88458

The NC Hi did follow the Builder's routing out of Chicago,might be better to start the Hi from where it spun off the Builder's routing with a connecting coach/sleeper(a la Eagle) from Chicago

Re: Timetables - offline flavor

 by Backshophoss ¦  Fri Feb 05, 2021 12:43 am ¦  Forum: Amtrak ¦  Topic: Timetables - offline flavor ¦  Replies: 41 ¦  Views: 6074

ON some of the VRF cams,scroll down the page to a link that has the 3 a week schedules on the LD's,also there will be a direct link to the Amtrak "Train Tracker" page

Re: All Things Cascades incl Vancouver

 by Backshophoss ¦  Fri Feb 05, 2021 12:38 am ¦  Forum: Amtrak ¦  Topic: All Things Cascades incl Vancouver ¦  Replies: 681 ¦  Views: 197263

For now the Taglo VII is running on train 500/505 rt.except for teething issues with the SC-44's,then the Horizon set covers,there is rare use of a P-42 as power in a pinch.
Sets of 11 and 14 have seen the return a View II bags in consist

Re: If you could restore a defunct Amtrak route

 by Backshophoss ¦  Fri Feb 05, 2021 12:29 am ¦  Forum: Amtrak ¦  Topic: If you could restore a defunct Amtrak route ¦  Replies: 379 ¦  Views: 71054

It will depend on how much of the US population gets vaccinated,Figure on at least 2/3 to 3/4 get to true "Herd immunity" level.

Re: Amtrak CEO Open Letter to Congress

 by Backshophoss ¦  Thu Feb 04, 2021 12:44 pm ¦  Forum: Amtrak ¦  Topic: Amtrak CEO Open Letter to Congress ¦  Replies: 35 ¦  Views: 5296

What really needs to be done is a total rebuild of both tubes under the hudson,a total removal of all of the concrete ,wiring and rebar affected by Sandy/brackish water. Only way to do that is by building Gateway to relive the traffic flow,,figure on some repairs to the iron shell that PRR installed...

Re: Amherst Show for 2021 Going Online

 by Backshophoss ¦  Wed Feb 03, 2021 1:57 am ¦  Forum: Toy Trains, Model Railroading, Outdoor and Live Steam ¦  Topic: Amherst Show for 2021 Going Online ¦  Replies: 5 ¦  Views: 1205

VRF did a decent job with the overall show,tech glitches are the norm with zoom and network feeds off the 'net.
Scale Trains did add a surprise of sorts,they acquired the HO and S scale model lines from MTH without that DCS decoder from heck.

Re: If you could restore a defunct Amtrak route

 by Backshophoss ¦  Wed Feb 03, 2021 1:38 am ¦  Forum: Amtrak ¦  Topic: If you could restore a defunct Amtrak route ¦  Replies: 379 ¦  Views: 71054

A long time ago PTJ did a decent article on the "3-C" corridor,But what will it take NOW to get CSX to allow the corridor to even exist? and be on time/useful?

Re: Amtrak CEO Open Letter to Congress

 by Backshophoss ¦  Wed Feb 03, 2021 1:32 am ¦  Forum: Amtrak ¦  Topic: Amtrak CEO Open Letter to Congress ¦  Replies: 35 ¦  Views: 5296

Car floats not safe for passengers, and sloooow across the Bay
PANYNJ SHOULD lead the Design/Build of Gateway.

Re: Commuter Rail Delay Discussion

 by Backshophoss ¦  Tue Feb 02, 2021 9:32 pm ¦  Forum: New Jersey Transit NJT Rail and Light Rail LRT ¦  Topic: Commuter Rail Delay Discussion ¦  Replies: 165 ¦  Views: 109237

Put the ex AMT MR-90's on the Gladstone Branch,a good "retirement" home for them The unfourturant problem is they cannot run under the ex PRR wire., but can run all over the M&E lines Again stop that R&D project from hell,turning a MLV II into an EMU,Design the Arrow IV instead,or ...

  • 1
  • 2
  • 3
  • 4
  • 5
  • 482