Late last night caught 3 MP-15's (2 up front, 1 behind) slowly hauling a long welded rail train up the grade between Wyandanch and Deer Park.
Railroad Forums
Late last night caught 3 MP-15's (2 up front, 1 behind) slowly hauling a long welded rail train up the grade between Wyandanch and Deer Park.
Rode by the entrance to the Astro yard today. Cars still being unloaded there.
Crossed over the Carl's Path crossing today. East of the crossing just slightly past where the old Pinter Brothers switch was there is now a segment of track (couldn't tell how long) that has been laid on the south side of the new roadbed but using what looks like wooden ties not concrete.
Again today 4 units (2 GP38-2's leading 2MP15ac's) rolling westbound through Deer Park with 13 (loaded centerbeams and stone cars) cars.
Saw 153 towing 'Darth Vader' west past the New Highway crossing early this afternoon.
This morning I caught an NYAR westbound passing Pinelawn. 4 engines (2 MP15ac's leading 2 GP38-2's) and 5 loaded scrap gondolas. Just now on the grade between Wyandanch and Deer Park the same power lashup heading eastbound with 32 cars. It was an assortment of boxcars, centerbeams, tankers, stone ca...
CarterB wrote:Stuff it...mount it...hang it on a wall....and leave it alone.After reading this thread for a long, long time I agree........
This morning NYAR 300, 270,155 with 6 cars (4 box (including 1 very clean RBOX), 1 loaded centerbeam, 1 tank) on the siding in Wyandanch. 300 was very clean compared to the 2 others. 300 also appears to have tinted cab windows.
The new intersection of Wellwood Ave and Long Island Ave.\Conklin St. is finally in operation. Since the new 2nd main will go through the existing Pinelawn station I'm guessing the station will be razed next. Anybody know where the new Pinelawn Station is to be located? The small one row parking lot...
What does the NYNJ use for power on the New Jersey side in Greenville yard?
In the area yesterday. Crews working removing the rails and ties from the double ended siding have reached the Deer Park Ave. overpass. There is a very large crane on Long Island Ave. driving large steel pilings into the ground by the pedestrian underpass that connects Long Island Ave. and Acorn St....
NYAR eastbound freight through Deer Park just now. Two GP38-2/MP15AC sets on the head end for power and 41 cars.
Man do I wish I lived closer.....
Eastern Railfan Productons video..... https://www.youtube.com/watch?v=-p3m0F69Hqw" onclick="window.open(this.href);return false;
Happened to drive by the Carl's Path crossing yesterday. The siding track just east of Carl's Path has been removed but the switch to the old Pinter siding was still in place. The track into the siding had been severed. Just past the east side of the switch the double ended siding track rails have b...
Your Junior High School...I guess that now would be the JFK Intermediate School on Lake (my son's school, daughter's middle school is Robert Frost). No activity since before Xmas. Track is missing from the switch to the Carls Path Xing with the old ties piled up off to the side. Yup. Showing my age...