Railroad Forums 

  • Search

  • Search it up!

Search found 287 matches

 Return to the advanced search

Re: Times Square 42nd St Shuttle Station Renovation

 by ajp ¦  Mon Jun 24, 2019 10:04 am ¦  Forum: NYCT MTA Subway, PATH and SIRT ¦  Topic: Times Square 42nd St Shuttle Station Renovation ¦  Replies: 118 ¦  Views: 22048

track 4 is isolated just to the northbound 7th ave local
track 3 is connected to track 1 near the gct end and just connected to the southbound Lex Ave local

With this proposal as reported tk 3 will be covered over at the TSQ end so it stands to reason they will cover it over at the GCT end.

Re: Times Square 42nd St Shuttle Station Renovation

 by ajp ¦  Sun Jun 23, 2019 11:25 pm ¦  Forum: NYCT MTA Subway, PATH and SIRT ¦  Topic: Times Square 42nd St Shuttle Station Renovation ¦  Replies: 118 ¦  Views: 22048

if they didn’t think to do thru running way back when what makes one think the MTA would do it now Even thou you have some of the infrastructure left on the Lex Ave any thought of expanding the single track interlocking on the 7 ave side would be mind boggling Then there’s the little detail of redoi...

Times Square 42nd St Shuttle Station Renovation

 by ajp ¦  Tue Jun 18, 2019 9:55 pm ¦  Forum: NYCT MTA Subway, PATH and SIRT ¦  Topic: Times Square 42nd St Shuttle Station Renovation ¦  Replies: 118 ¦  Views: 22048

apparently a lot of changes are coming to the shuttle https://www.wsp.com/en-US/insights/times-square-shuttle-station-prepares-for-reconstruction Also some fun facts about the shuttle history on the columbia.edy abamdoned stations site by Joseph Brennan regarding the "other" Grand central ...

Re: 42st shuttle maintenance cycle

 by ajp ¦  Mon Jun 17, 2019 9:45 pm ¦  Forum: NYCT MTA Subway, PATH and SIRT ¦  Topic: 42st shuttle maintenance cycle ¦  Replies: 7 ¦  Views: 2986

my question was what was the time between changeouts either in hours or distance travelled for mandatory maintenance

42st shuttle maintenance cycle

 by ajp ¦  Mon Jun 17, 2019 8:18 am ¦  Forum: NYCT MTA Subway, PATH and SIRT ¦  Topic: 42st shuttle maintenance cycle ¦  Replies: 7 ¦  Views: 2986

what the the average mean time between shuttle consist exchanges on the shuttle for maintenance cycles?
dare i assume that they don’t wrap the trains in place but in some yard then exchange them also?

Re: new departure boards at gct

 by ajp ¦  Mon Jun 03, 2019 8:55 pm ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: new departure boards at gct ¦  Replies: 37 ¦  Views: 8241

now that the New HAven side is totally replaced, it makes the Harlem/Hudson side pale in comparison

Re: new departure boards at gct

 by ajp ¦  Thu May 02, 2019 4:35 pm ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: new departure boards at gct ¦  Replies: 37 ¦  Views: 8241

if the main entrance to the LIRR will be in the area near the ‘40 tracks (Biltmore room?) their departure boards would make sense to be there (i think the old chalkboards are still there for their use🙃) With the new signs and their technology it maybe possible to slip a few seconds of advertising be...

Re: new departure boards at gct

 by ajp ¦  Wed May 01, 2019 8:59 pm ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: new departure boards at gct ¦  Replies: 37 ¦  Views: 8241

I figured after all the opinions garnered on the Solaris on the Amtrak site sme member would of commented on the architecual and esthetic aspects
of GCT. Its not the ceiling painted backwards, nor the mystery of track 100 or the unmaed tool car

But then Dutch has never held an opinion

new departure boards at gct

 by ajp ¦  Tue Apr 30, 2019 9:37 pm ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: new departure boards at gct ¦  Replies: 37 ¦  Views: 8241

What is the group opinion on the new departure boards st GCT?
Local media reports various opinions from commuters. Some claim
they remembered pre 1990 Solari boards (I don’t remember those)

Re: M-3 retirement

 by ajp ¦  Sat Apr 27, 2019 11:11 am ¦  Forum: MTA Metro-North Railroad and CtRail Passenger Rail (SLE, Hartford, Extensions) ¦  Topic: M-3 retirement ¦  Replies: 15 ¦  Views: 7849

i might be crazy but didn't MNCR decline the M9 order and replaced it with refurbed M3's from the
LIRR and cosideration of MLV's?

Re: Winter Park Express: Denver-Winter Park Ski Train

 by ajp ¦  Wed Jan 02, 2019 5:40 pm ¦  Forum: Amtrak ¦  Topic: Winter Park Express: Denver-Winter Park Ski Train ¦  Replies: 121 ¦  Views: 29714

EGE also next to the old DGRW line that goes thru Avon (beacer creek) and Leadville(Vail) and further down into Crested Butte

thinking why cant there be a an alternative Ski train on the ond Zephyr route?

Re: Winter Park Express: Denver-Winter Park Ski Train

 by ajp ¦  Wed Jan 02, 2019 5:36 pm ¦  Forum: Amtrak ¦  Topic: Winter Park Express: Denver-Winter Park Ski Train ¦  Replies: 121 ¦  Views: 29714

theres always EGE into Eagle Vail

Re: FL9 FL-9 F10 F-10 Status Discussion Operation Dispositio

 by ajp ¦  Thu Feb 22, 2018 2:09 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: FL9 F-10 Discussion: Metro-North / CtDOT / Amtrak ¦  Replies: 2560 ¦  Views: 763551

I understand that the engineer has no side egress on tracks 3 and 4 - at least a P42 has a rear door that cam lead to a passenger car. This points out that passengers only have egress out of the foward and rear doors of an EMU and the rear door of a Bomb car. This gets tricky when you have a push/pu...

Re: FL9 FL-9 F10 F-10 Status Discussion Operation Dispositio

 by ajp ¦  Wed Feb 21, 2018 9:57 pm ¦  Forum: New York City Area Wide Rail Transit Issues (Cross-Agency) ¦  Topic: FL9 F-10 Discussion: Metro-North / CtDOT / Amtrak ¦  Replies: 2560 ¦  Views: 763551

so today (2/21) i was riding MNR into GCT. We were on track 4 (westernmost) past 125th Street at approx 11a A train passed coming out of GCT on track 2 and I realized it had amfleet coaches and a P42 painted in Phase 3 colors bringing up the rear. I didn't catch what was on the head end. How did thi...

Re: Uniq. Eqpmt Sightings: Private Varnish (PV's), Charters,

 by ajp ¦  Thu Feb 16, 2017 6:54 pm ¦  Forum: Amtrak ¦  Topic: Uniq. Eqpmt Sightings: Private Varnish (PV's), Charters, etc ¦  Replies: 5058 ¦  Views: 1309988

shop move on somebody else's nickle?

  • 1
  • 2
  • 3
  • 4
  • 5
  • 20