by baldwr
As of Monday June 27 notices were up at Bound Brook informing riders that TVMs were installed and they have untill mid July to get used to the new way of life. When I was at the station (around 3:45pm) the shelter was finished and the techs were working on installing the baseframes for the machines.
I assume that the machines were to be on line by the end of the day or the following day given the notice, but assumptions are dangerous. I haven't been back home since Monday so I cannot verify completion. The location, as someone speculated in an earlier post, is at the tunnel enterance so they are accessible to east- and westbound riders.
I assume that the machines were to be on line by the end of the day or the following day given the notice, but assumptions are dangerous. I haven't been back home since Monday so I cannot verify completion. The location, as someone speculated in an earlier post, is at the tunnel enterance so they are accessible to east- and westbound riders.