 #1634566  by CSRR573
 
Cant wait for that chase! Regarding 7470, at the middle of the 2010s, she had her 15 year FRA mandated rebuild completed. Why wasnt the crown sheet issues brought up then and same with the trucks for the tender. Also , since shes been down for the crown sheet issues, does that count against her mandatory 15 year/days used total?
 #1634736  by Who
 
CSRR573 wrote: Fri Dec 08, 2023 8:41 pm Cant wait for that chase! Regarding 7470, at the middle of the 2010s, she had her 15 year FRA mandated rebuild completed. Why wasnt the crown sheet issues brought up then and same with the trucks for the tender. Also , since shes been down for the crown sheet issues, does that count against her mandatory 15 year/days used total?
For starters the 15-year inspection was partially done when the railroad was sold. Pitting was observed during the last boiler washout that management didn't like seeing. After running calculations, the crown sheet still passed the FRA inspection but at a lower pressure and they weren't interested going that direction, so they ordered the crown sheet to be replaced. Last I heard, they were waiting for the new crown sheet to come from the steel mill, and then they were hiring a contractor to come in and weld in the new crown sheet; I guess they have about 2 to 3 months of welding a head of them, so they've hired a big contractor that can handle the job. They are pushing hard to get 7470 up and running again for next year when the railroad celebrates its 50th Anniversary.

As for the tender trucks, cracks were discovered in both trucks, they found identical trucks as replacements only to discover they had the same cracking issue, so they abandoned that idea of finding matching trucks and went with modern trucks with roller bearings.
 #1637063  by NHV 669
 
North Stratford perhaps, I believe Fritz posted that the other two MoW cars had left Island Pond. Going to be a busy summer already, with all the cars and equipment coming over.

It's about 8° here as I type, 16 miles and change west of Gateway.
 #1637469  by NHV 669
 
The coaches came over the SLR last night.

Looking at the schedule, CSRX is offering four departures this weekend for the snow trains. 90 minutes apart, starting with the first departing North Conway at 10:30, the last at 3:30.
 #1637483  by Who
 
The shuttling of passengers is not as popular as it initially was 4 years ago when they started these trains, the majority of riders just want to experience a train ride; it's one of the reason the railroad is expanding their winter operations next year.
Now I'm hearing rumors that Patriot Rail has also requested winter access for their operations, I look forward to seeing what they do. All and all, I would say all 3 tourist operations are doing very well and that's a great sign.
 #1639056  by NHV 669
 
Sounds like the 470 Club hopes to test the 1741 in the next few weeks, with paint to follow in the near term as they reach their donation goals. Updated number boards are in on the unit, and work progresses towards full operational status.
 #1639702  by jfwjr1
 
NH state representative Jonathan smith had introduced house bill 1468. The Final language of this horrid bill, proposes to rip up the tracks of the Conway branch…
Time to write every congress person, governor etc to stop this crazy bill and action from proceeding .
 #1639720  by Who
 
The Conway Scenic has expressed interest in the branch south of Conway, hopefully the state doesn't shut the door on their face like MEDOT did last year for the Mt. Division.
 #1639736  by MEC407
 
It could potentially work, but raising that kind of money for railroad-related causes is very difficult. Here in New England we've seen many examples of it taking years or decades to raise enough money just to restore a locomotive or a trainset (e.g. MEC 470, Flying Yankee)... and those are tiny sums of money compared to what it costs to restore a branchline just to Class 1 standards.
 #1639743  by Goddraug
 
In a conversation over on Facebook, Cory Fothergill of CSRR mentioned in the comment section that there were four potential freight customers in Tamworth alone that had expressed interest in the last 6 months (though it’s probably 7 months now). I feel like they might deserve a say in this.

Doesn’t the state also owe it to any railroad to publish a final RFP before removal of the tracks? I fear the precedent that could be set by this.