Railroad Forums 

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, FL9AC, Jeff Smith

 #1635961  by 8th Notch
 
nomis wrote: Mon Dec 11, 2023 4:45 am The slowness refers to computer restricted loading pattern of the diesel at no/slow speeds to achieve the emissions standards.
They’ve always been known as slow to load, even before the emissions standards.. A lot of guys say GE stands for “Going Eventually.” The main difference with a P42 vs an EMD is the turbo on a P42 is exhaust driven vs an EMD being mechanically driven, so the GEs are more prone to turbo lag but as stated once they go, they go and I will add that they don’t want to stop.
  • 1
  • 6
  • 7
  • 8
  • 9
  • 10