Greg! Cut some of those trees down, man!
Dave Becker
Dave Becker
~Dave Becker
Moderator: Fairbanks-Morse Forum
Moderator: Fairbanks-Morse Forum
Railroad Forums
Moderator: Luther Brefo
BR&P wrote:"Expect moving equipment on any track, at any time, in either direction."Yup. I always slow for the crossing because one never knows.
railwatcher wrote:9/5/06hmmm..odd.
North bound train was in Avon shortly after 9 am and did some switching and moved on towards Rochester by 9:45am. Noted a load of lumber sitting on a centerbeam car in the Avon yard, that was brought in on Friday, curious who the customer is for this load inbound. Usually, Matthew and Fields gets their loads dropped directly from the Genesee Junction yard, so I dont think it is their load. Anybody have any clues?
Greg