Thanks too Mike's post, I drove after work for some pictures.
Here's the new pavement for the Whipple St crossing.
(58.96 KiB) Downloaded 4950 times
The ballast dropped in Lewiston has been tamped. Haven't checked east of here yet. Here's a shot of the regulator near Whipple St.
(72.48 KiB) Downloaded 4950 times
The tamper was working near Holland St tamping the rock recently dropped near the new crossings. The Middle Street crossing has been completely redone. That track panel I had pictured being assembled was put in and the surface is now a little raised. I didnt take pics here as the xing was closed and crews were still at work on it. It will probably be the nicest crossing in Auburn and Lewiston when opened. The crossing at Spring St in Auburn is marked to be worked on. Lines and arrows spray painted on the pavement. There are 2 long sections of rail that were dropped nearby the crossing about 2 weeks ago so this one may be getting a major rebuilt too instead of just pavement. It sure needs it!