by UnstableOrbit
NY&LB wrote:Nope.....no connection currently, line is broken at both Lakehurst and Lakewood, unless it was Hi-Rail equipmentAhh, darn. I knew about the track being pulled as I ghosted for awhile on these forums and often check on the status of the trackage using google earth. I was hoping that maybe this was an indication that they had reconnected the trackage. Oh well, thanks anyways.
Re: CR on the Southern Secondary
by RailsEast » Mon Mar 17, 2014 4:51 pm
There were 2 sections of rail pulled; the first one in Lakehurst in June '09, MP 65.9.....
http://njtwom.rrpicturearchives.net/sho" onclick="window.open(this.href);return false; ... id=1640900
And the second one, just south of the runaround track in Lakewood, in December '10, MP 61.1.....
http://njtwom.rrpicturearchives.net/sho" onclick="window.open(this.href);return false; ... id=2339860
IIRC, the fairly extensive work on the Rt.9 trestle was done in late 2010/early 2011.
Chris