by Backshophoss
At the time the 63rd st tunnels were built,it was the height of the "tagging craze" on subway cars,and a very low point
of NYC's finances(Mayor Wagner/Linsdey terms),SAS and ESA were considered "dreams" back then,granted the now LIRR tunnels were
built with some future use in mind,but many years away.
The walls at Lex/63rd st were made to be removable at a later date,a "CYA" if SAS was never restarted.
of NYC's finances(Mayor Wagner/Linsdey terms),SAS and ESA were considered "dreams" back then,granted the now LIRR tunnels were
built with some future use in mind,but many years away.
The walls at Lex/63rd st were made to be removable at a later date,a "CYA" if SAS was never restarted.
The Land of Enchantment is not Flyover country!