The new study for electrification report is to be released soon. A 2010 estimate for electrification was $450 million. Which means the costs of electrification doubles the costs of building the line.
http://www.insidetoronto.com/news-story ... n-dollars/
The 22 km UP project construction is on budget near $456 million, including the costs of the 3 km aerial guideway, signal and track upgrades, 4 stations, and 18 DMUs built by Nippon Sharyo. It'll be interesting to see how much electrification will cost from the new report.
http://www.insidetoronto.com/news-story ... n-dollars/
The 22 km UP project construction is on budget near $456 million, including the costs of the 3 km aerial guideway, signal and track upgrades, 4 stations, and 18 DMUs built by Nippon Sharyo. It'll be interesting to see how much electrification will cost from the new report.