These proposals remind me of all the grand ideas MTA had for extending various subway lines in the early 1970's. And very little of that ever got done. :(

Re: New Levittown Station

 by Head-end View ¦  Mon Dec 04, 2023 6:58 pm ¦  Forum: SEPTA (and PATCO) ¦  Topic: New Levittown Station ¦  Replies: 7 ¦  Views: 906

Thanks guys. I hope SEPTA will at some point install Key Vending Machines at Levittown and Langhorne. Otherwise how will passengers be able to get Key cards at those stations where they now buy them from the ticket agents? Limiting access to purchasing by only having the machines at Center City stat...

New Levittown Station

 by Head-end View ¦  Sun Dec 03, 2023 6:41 pm ¦  Forum: SEPTA (and PATCO) ¦  Topic: New Levittown Station ¦  Replies: 7 ¦  Views: 906

On a recent trip to the Philadelphia area I used the Levittown Station. I was surprised to see that the ticket office is a separate temporary-looking structure next to the new station building itself. Why would a permanent ticket office not have been included in the original design and construction ...

Re: Grand Central Madison TERMINAL DISCUSSION THREAD

 by Head-end View ¦  Fri Nov 24, 2023 6:55 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Grand Central Madison TERMINAL DISCUSSION THREAD ¦  Replies: 45 ¦  Views: 8815

Point taken rdr2253 . You're right, and I hadn't realized they are only single head signals. I just watched cab-ride videos in both directions and it seems that even approaching a diverging route, a single green or yellow is displayed. Could be different signal rules are in effect in the Grand Centr...

Re: #4 Red Line Cars 1900-2151

 by Head-end View ¦  Thu Nov 16, 2023 3:00 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: #4 Red Line Cars 1900-2151 ¦  Replies: 132 ¦  Views: 27165

The 1963 cars on the Red Line were crappy to begin with and I was glad to see them go. But the 1800's are nice cars that I wish would be overhauled and kept in-service for the foreseeable future. And who knows LOL? If the CRRC order continues the way it's going, maybe that will actually end up happe...

Re: Grand Central Madison TERMINAL DISCUSSION THREAD

 by Head-end View ¦  Mon Nov 13, 2023 6:52 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Grand Central Madison TERMINAL DISCUSSION THREAD ¦  Replies: 45 ¦  Views: 8815

I don't see a "48".

Re: #4 Red Line Cars 1900-2151

 by Head-end View ¦  Tue Oct 31, 2023 2:02 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: #4 Red Line Cars 1900-2151 ¦  Replies: 132 ¦  Views: 27165

What does that annoying beeping signify ? That the doors are open?

Re: Second Avenue Subway Phase II Planning / Construction

 by Head-end View ¦  Wed Oct 25, 2023 5:50 pm ¦  Forum: NYCT MTA Subway, PATH and SIRT ¦  Topic: Second Avenue Subway Phase II Planning / Construction ¦  Replies: 94 ¦  Views: 38659

Am I reading that right?!!? Over 6 billion dollars to build a mile and a half of subway. Who would have thought? I hope it's worth the expense.........

Re: Grand Central Madison TERMINAL DISCUSSION THREAD

 by Head-end View ¦  Sat Oct 21, 2023 7:43 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Grand Central Madison TERMINAL DISCUSSION THREAD ¦  Replies: 45 ¦  Views: 8815

Negative. The signals in the GCT tunnel are not reduced-aspect signals. They are conventional color-light signals showing standard signal aspects. The same as they now have in Harold Interlocking.

Re: SEPTA NPT card will be "SEPTA Key"?

 by Head-end View ¦  Fri Oct 20, 2023 5:51 pm ¦  Forum: SEPTA (and PATCO) ¦  Topic: SEPTA NPT card will be "SEPTA Key"? ¦  Replies: 995 ¦  Views: 190056

From everything being said here, it appears that things haven't changed too much on Septa from the days of the old fare system, which someone on here once called "Byzantine". LOL

Re: Green Line Extension Lechmere to Medford

 by Head-end View ¦  Fri Oct 20, 2023 5:46 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Green Line Extension Lechmere to Medford ¦  Replies: 1355 ¦  Views: 433424

Railroading is a pretty old business; been around since the 1800's. So now in the 21st Century we can't even get something as simple as the track gauge correct on a new project? If we can't even build a railroad track correctly we've got a much bigger problem I'd say. :( Shades of the Big Dig..........

Re: SEPTA NPT card will be "SEPTA Key"?

 by Head-end View ¦  Thu Oct 19, 2023 5:48 pm ¦  Forum: SEPTA (and PATCO) ¦  Topic: SEPTA NPT card will be "SEPTA Key"? ¦  Replies: 995 ¦  Views: 190056

Thanks for all the help guys. :-D

Re: SEPTA NPT card will be "SEPTA Key"?

 by Head-end View ¦  Sun Oct 15, 2023 6:52 pm ¦  Forum: SEPTA (and PATCO) ¦  Topic: SEPTA NPT card will be "SEPTA Key"? ¦  Replies: 995 ¦  Views: 190056

I'm taking a trip to the Phila area in a few weeks and I have a couple of dumb questions: First, if I buy a key card at an outlying station with a staffed ticket office (like Langhorne), will the clerk selling me the card also be able to load a round-trip fare to Center-City or an Independence Pass ...

Re: Green Line Extension Lechmere to Medford

 by Head-end View ¦  Sat Sep 30, 2023 6:03 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Green Line Extension Lechmere to Medford ¦  Replies: 1355 ¦  Views: 433424

And how the hell was that allowed to happen? Wasn't this designed by professional engineers who presumably would have taken that into account? :( And if the spec's were right, but the installation was done out of spec, then who was supervising and inspecting the work? Shouldn't the deviation from sp...

Re: Green Line Extension Lechmere to Medford

 by Head-end View ¦  Wed Sep 27, 2023 6:32 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Green Line Extension Lechmere to Medford ¦  Replies: 1355 ¦  Views: 433424

How can they have track defects on such a recently built railroad?