by toolmaker
bigfreight wrote:7324 came thru Lancaster headed north with 1 empty from Presby at 500PM . Missed the southbound run. It must of happened late Friday afternoon or early Saturday morning when I was gone. There some kind of a public hearing coming up in Whitefield about the tracks south of town going towards Littleton. The snowmobile and ATV club want to make the line a rail-trail and have said the NHCR has not lived up to the contract to maintain the line and that the line is better suited for a rail-trail than storage of railcars.When I lived in Littleton, I would walk the old right of way toward Bethlehem and the tracks and switches were in a very deteriorated condition by 2007. The entire line would need clearing and track rehab to keep a train on the rails. The last lumber loads by rail to the end of the line stopped at the end of 1997. The ties were so bad you could pull the spikes from the tie plates with only your fingers.
As far as industry? The only potential service would be to the 3 fuel dealers still operating and located along the line, none have sidings. Those would be Stiles, Amerigas and Harris. Irving has a very active fuel terminal on Meadow street and tanker trailers are in and out of there everyday. Maybe the state of NH would reconsider receiving rail shipments again for aggregates and winter anti-skid materials. Several times a year when I lived near the Dells Road DOT site you would see tractor trailers from the seacoast lined up along the road, waiting to unload salt and sand used to keep the North country open for the winter. I'm sure the same fleet of trucks would be dispatched to other NH-DOT north country sites day after day.
-gary
“If practice makes perfect, and if nobody's perfect, why practice?"
“If practice makes perfect, and if nobody's perfect, why practice?"