by MNCRR9000
I have been read that the MNRR wants to install a signal system along the Danbury Branch so that they can increase the frequency of the trains that can go along the branch. Does anyone know whether they have done this yet or when are they supposed to do it. I also read that once the signal system is in place Rail Traffic Controllers down in GCT will be able to see the trains on the branch. What type of control system does the Danbury Branch currently use?[/code]