by BostonUrbEx
StefanW wrote:Apparently similar issues on three Chelsea crossings right now... Arlington / 6th St., Spruce St. and Everett Ave. The A.C. said it was lingerings issues from power outages. Seems to have set back (at least) #62, #162, #63 and #109 each by about 4-5 min.From what I heard, all gates were stuck in the down position through Everett and Chelsea. Or maybe that was the day before.
|| REGIONALRAIL ||