Railroad Forums 

  • Track washout in Orrington - 03-24-2012

  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

 #1030510  by MEC407
 
From the Bangor Daily News:
Bangor Daily News wrote:Water from a beaver dam that burst Friday night — in the same place a break occurred in 2001 — has temporarily wiped out Swetts Pond Road and a portion of the nearby railroad tracks.

Road and Pan Am rail crews could be seen Saturday scrambling to fix the flood damage.
...
Pan Am rail workers filled the washed out rail line with new gravel on Saturday while a train, destined for Bucksport, sat on the train tracks waiting for the work to be completed.
Read more at: http://bangordailynews.com/2012/03/24/n ... orrington/