by dbperry
MBTA Contract No. H91CN01
http://www.mbta.com/business_center/bid ... 6442458123" onclick="window.open(this.href);return false;
http://www.mbta.com/business_center/bid ... 6442458123" onclick="window.open(this.href);return false;
The Project includes design and construction to replace six commuter rail bridges over roadway or track:
- Lynn Fells Parkway Bridge (No. M-14-001, M.P 7.10), carrying two tracks of the West Route commuter rail service over Lynn Fells Parkway in Melrose, MA.
- Parker Street Bridge (No. L-04-33, M.P. 25.99), carrying two tracks of the West Route commuter rail service over Parker Street in Lawrence, MA.
- Commercial Street Bridge (No. L-18-001, M.P 10.59), carrying two tracks of the East Route commuter rail service over Commercial Street in Lynn, MA.
- Bacon Street Bridge (No. W-13-011, M.P 16.07), carrying two tracks of the Framingham/Worcester commuter rail service over Bacon Street in Wellesley, MA.
- Intervale Road Bridge (No. W-29-016), carrying two active tracks of the Framingham/Worcester commuter rail service and two abandoned tracks over Intervale Road in Weston, MA.
- New Hampshire Main Line over High Line and Railroad Yard Bridge (No. S-17-043, M.P 1.13), carrying two tracks of the New Hampshire Main Line commuter rail service over High Line Road and Railroad Yard Tracks in Somerville, MA.
"Twitter Dave"
Engineering Manager, MBTA
MY POSTS HERE ARE UNOFFICIAL and are my own personal opinion. My posts are not official MBTA policy or communications.
https://twitter.com/FramWorMBTA
http://FramWorMBTA.weebly.com/
MBTA schedule archive: http://www.dbperry.net/MBTA/
Engineering Manager, MBTA
MY POSTS HERE ARE UNOFFICIAL and are my own personal opinion. My posts are not official MBTA policy or communications.
https://twitter.com/FramWorMBTA
http://FramWorMBTA.weebly.com/
MBTA schedule archive: http://www.dbperry.net/MBTA/