by baretables
Railroad Construction has a sizable amount of equipment at the South Jefferson Road team track area. Does anyone have information about this project?
In the team track area there is what appears to be a foundation form adjacent to the siding.
East of the South Jefferson Road grade crossing both sides of the right of way have been cleared and graded(with a wider cut on the south side).
In the team track area there is what appears to be a foundation form adjacent to the siding.
East of the South Jefferson Road grade crossing both sides of the right of way have been cleared and graded(with a wider cut on the south side).