by hrfcarl
I am sure this has been asked before, so please forgive the newbie.
Lets say the mall above the LIRR Atlantic Ave terminal wants to use NYA service for deliveries or waste removal, could the engines fit on track 1 at the terminal and in the tunnels on that branch? If yes, could a tunnel connect the Atlantic branch to Bay Ridge branch at/near East NY LIRR station be built so these freght trains would not have to go thru Jamica?
Lets say the mall above the LIRR Atlantic Ave terminal wants to use NYA service for deliveries or waste removal, could the engines fit on track 1 at the terminal and in the tunnels on that branch? If yes, could a tunnel connect the Atlantic branch to Bay Ridge branch at/near East NY LIRR station be built so these freght trains would not have to go thru Jamica?