by rnetzlof
Monday, Aug. 7 is supposed to be the day the first train runs on the newly built connector from the Conemaugh line to Clarksburg, where the new line connects to the old Ridge branch of the B&O/BR&P.
Does anyone know when the train is to run?
I'd likke to get down there to see it but it's a 90 mile drive and I'd hate to do that and find I was too late.
Bob Netzlof
Does anyone know when the train is to run?
I'd likke to get down there to see it but it's a 90 mile drive and I'd hate to do that and find I was too late.
Bob Netzlof
Bob Netzlof a/k/a Sweet Old Bob