https://arynews.tv/pakistan-railways-pl ... aches/amp/
Pakistan Railways plans to procure 230 passenger coaches
ISLAMABAD: Pakistan Railways is finalising a plan to procure 230 passenger coaches and 820 High Capacity Wagons under the Public Sector Development Programme (PSDP) aiming help to improve the speed of the trains and ensure adherence to fixed timings.
“Out of the total, around 46 Completely-Built-Up (CBU) passenger coaches have been procured up till now while the remaining 184 would be manufactured in the country and the coaches would be able to travel at the speed of 160km/h,” said an official in the Ministry of Railways.
He said Pakistan Railways is putting maximum efforts to complete rehabilitation and reconstruction work on the railway track along with improving the speed of the locomotives to carry passengers to their respective destinations on time.
The infrastructure, including the track and signaling system from Karachi to Peshawar, Main Line-I (ML-I), and doubling of track from Lahore to Peshawar (462.20 Km) was also being revamped, he added.
...
Next stop, Willoughby
~el Jefe :: RAILROAD.NET Site Administrator/Co-Owner; Carman at Naugatuck Railroad
YouTube Instagram Facebook
~el Jefe :: RAILROAD.NET Site Administrator/Co-Owner; Carman at Naugatuck Railroad
YouTube Instagram Facebook