by scratchyX1
STrRedWolf wrote: ↑Sun Aug 28, 2022 9:10 am Baltimore's LRT was built so that they had a lot of single-track lines and headways of 7.5 minutes... but it was also built on pure politics and a floated bond. The bond's been paid back for quite a while, and they got Federal funding for double-tracking all the way up to a small section where there isn't much room for another track.At the north end, where it's so bendy, the speeds are low.
And leading into the airport station.
And sadly now that it's double tracked... 7.5 minute headways are wishful thinking.