R36 Combine Coach wrote: ↑Fri Aug 07, 2020 10:37 pmDOJ, because Barr.Gilbert B Norman wrote: ↑Thu Aug 06, 2020 11:39 am But back on the rails, one must wonder; couldn't the entire V-II order just be some kind of "trap" to set Amtrak up for "some kind of investigation" during Trump's second term?The delays date back to 2013-2015. After the 70 baggage cars were delivered and accepted in 2015, the assembly line in Elmira seemed to have slowed down. The shells for the diners and some early sleepers were actually built in 2012-2013, but not assembled completed until long afterward (2018 for the diners). The baggage cars were the only portion of the fleet delivered on time.
And who would do such investigation, OIG or DOJ?