Hopefully there's a tie job coming soon as well. Even from that height the splinters are easily visible.They did 10,000 ties from Rockingham to Newington late summer and fall also some stone and surfacing.
They also had R.J. Corman change out 2 miles of rail up in Newington, they installed the rail they lifted from the passing siding at Rockingham which was much heavier.
Back in 2014 they did 5,000 ties and some surfacing also. Go back to pages 15 to 25 and you'll see photos I took of the 2014 rebuild.
MEC