• Final Customers - Boston Area

  • Pertaining to all railroading subjects, past and present, in New England
Pertaining to all railroading subjects, past and present, in New England

Moderators: MEC407, NHN503

  by bostontrainguy
 
BostonUrbEx wrote:Boston Paperboard was switched by BO-1 this morning, Friday, February 2nd, 2018. By receiving two loaded Plate F boxcars, it has renewed itself as the last actively remaining rail customer in Charlestown, and last Pan Am customer in Boston.
A few great photos of this move are posted on http://photos.nerail.org/" onclick="window.open(this.href);return false;. Check them out!

Need to add:
Checking out Google Earth of Boston Paperboard there seems to be only one loading door. How are they going to unload the second car? Also, why rebuild the tracks to clear two cars? Couldn't they just do one car at a time?

If you go to the street level, you can see that the rest of the Yard 10 lead has been removed. This was going to be rebuilt as part of the Greenline extension. Is that still in the plans?
  by GP40MC1118
 
BP has two doors...

Only one short track panel was put in to accommodate this move because its more than one engine and a car length between the switch
to BP and the north side of the crossing at Innerbelt.

And, unfortunately, the Yard 10 lead is being rebuilt for PAR due to GLX. They should be going though old Yard 8 as they do now, but GLX
and the bikers rule...

D
  by bostontrainguy
 
It's pretty funny. I am now living in Florida and close to the CSX "S" line which has had miles of new track installed for a major upgrade. BUT, I still get excited about 100 feet of new track and a move of two cars back on Boston!
  by GP40MC1118
 
Surprise, surprise...they just got a third load. Should be spotted this morning.

D
  by GP40MC1118
 
Looks like the third load never got spotted Friday, BO-1 derailed trying to pull out the empties yesterday.
All rerailed, but the track is out of service for now.

D
  by bostontrainguy
 
Is the track on that side of the crossing (east) going to be rebuilt as part of the Yard 10 track renewal? Would the track to Boston Paperboard be part of the work?
  by GP40MC1118
 
The Yard 10 lead from Mystic down to FX is being rebuilt for the rerouting of freight
due to GLX (Green Line Project). As far as Boston Paperboard goes, I don't know
whose responsible for fixing it.

D
  by Area4
 
Has anyone heard word on B721 being annulled very soon?

Thanks!
  by fogg1703
 
There was a recent rumor.....however this has been rumored for years now.
Last edited by MEC407 on Sat Apr 28, 2018 9:58 am, edited 1 time in total. Reason: unnecessary quoting
  by BostonUrbEx
 
Swift will be removed from service fairly soon, but haven't heard the latest date. Keolis has been doing qualifying runs on Pan Am's Worcester Main for equipment transfers. Have yet to hear how the produce will get to Everett via Pan Am (SEPO will be making drops in Lawrence, maybe?) or if B721 will be back once Swift is back in service.

Somewhat related, how many days does Houghton Chemical have left?
  by Area4
 
How long is Swift out of service for. Is Houghton ending in the Summer??
Last edited by MEC407 on Sat Apr 28, 2018 9:59 am, edited 1 time in total. Reason: unnecessary quoting
  by GP40MC1118
 
Swift - outage duration unknown, but at least seven weeks (with no FRML passenger trains on weekends).

Houghton should be done with rail this summer.

D
  by Area4
 
I'm guessing the Grand Junction is out right now as this is the tracks, look to be replacing both tracks at that part. No B721 this week or any MBTA moves.
You do not have the required permissions to view the files attached to this post.
  • 1
  • 5
  • 6
  • 7
  • 8
  • 9
  • 11