by GP40MC1118
Produce has nearly dropped off to nothing of late and like the previous poster said,
its all scrap in and out. Understand some gondolas or hoppers made a one-way trip
and cut up.
CQ is a PAR customer, so CSX is not a factor. Don't know it this fits into EHH's
Precision Railroading scheme either. Surprised B721 has lasted this long! I suspect
once the MBTA Green Line Project goes full tilt and the Swift Interlocking redo knocks
the Grand Jct out for months or a year, that'll be it.
D
its all scrap in and out. Understand some gondolas or hoppers made a one-way trip
and cut up.
CQ is a PAR customer, so CSX is not a factor. Don't know it this fits into EHH's
Precision Railroading scheme either. Surprised B721 has lasted this long! I suspect
once the MBTA Green Line Project goes full tilt and the Swift Interlocking redo knocks
the Grand Jct out for months or a year, that'll be it.
D