by Disney Guy
The shoo fly track takes shape, with twin guard rails for added rigidity.
Electrical conduit tubes are stacked up at the far (Boston) end of the track, suggesting that temporary power feeder cables will be laid in this trackway.
As of 1/12/16 switch work on the existing tracks has not begun
Electrical conduit tubes are stacked up at the far (Boston) end of the track, suggesting that temporary power feeder cables will be laid in this trackway.
As of 1/12/16 switch work on the existing tracks has not begun
You do not have the required permissions to view the files attached to this post.
Build something. Anything.