by UPRR engineer
How long till Canac takes over the shortlines and is the number one contract switcher? With all money the railroads have given them, wonder if there trying to sell the stuff to the shortlines yet.
Railroad Forums
Moderator: Aa3rt
freightguy wrote:I work for a shortline railroad on LI. The current regime is opposed to RC operation. Most our trains still have three man crews when the manpower is available.Hmmm, seeing as how there are only 2 shortline railroads on Long Island, I wonder which one you work for...