by DutchRailnut
MNCR is running both waterworlds as of this week.
Waterworld no 1 is running with two tankcars and GP35r 101 and 2012(NYC painted) braketing the consist.
Waterworld no 2 has GP35r 103?? and CDOT 2014 with waterworld 2 and two tankers.
One train does the Harlem line only, the second train does the New Haven line and Danbury branch(lower end)
Waterworld no 1 is running with two tankcars and GP35r 101 and 2012(NYC painted) braketing the consist.
Waterworld no 2 has GP35r 103?? and CDOT 2014 with waterworld 2 and two tankers.
One train does the Harlem line only, the second train does the New Haven line and Danbury branch(lower end)
If Conductors are in charge, why are they promoted to be Engineer???
Retired Triebfahrzeugführer. I am not a moderator.
Retired Triebfahrzeugführer. I am not a moderator.