• Kawasaki Test Train On Tap

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

  by efin98
 
30 rolls? that'll cost you a pretty penny!

  by Robert Paniagua
 
And even more expensive to put them on CD, and then to link them to your online photo gallery to show us all :-)

  by MBTA F40PH-2C 1050
 
when do you think the cars will be tested on the south side?

and... what is the status of the 902 car? where is it? south or north side
  by GP40MC1118
 
The Kawaski's are going back out on the road again. Saturday 9AM on
the Lowell Line. 1036 still the projected power.

Dave

  by CSX Conductor
 
MBTA F40PH-2C 1050 wrote:when do you think the cars will be tested on the south side?

and... what is the status of the 902 car? where is it? south or north side
I was wondering the same thing. :-)
  by GP40MC1118
 
No word on Southside tests as yet.

There was going to be a test train Sunday, but its not running now.

Saturday's train is still on...same as last weekend...

Dave

  by Porter Sq
 
Is the test train going back out this weekend?I saw it today next to the fuel depot.All four cars are there with 1129 for power and 1718 control cab. I could also see that they haven't taken the plastic covers off the seats yet.

  by Porter Sq
 
Is the test train going back out this weekend?I saw it today next to the fuel depot.All four cars are there with 1129 for power and 1718 control cab. I could also see that they haven't taken the plastic covers off the seats yet.