by mpickle
Does anyone know when the new part of the green line from North station onward is slated to open?
thanks
thanks
Railroad Forums
Moderators: sery2831, CRail
Ron Newman wrote:The "new tunnel" has been finished for a long time. What still needs to be built is most of the incline from the tunnel portal to Science Park station.In fact, the tunnel which goes under the Fleet Center (adjacent to the underground parking garage) was built at the time the Fleet Center was built - I believe it was part of the building design!
MBTA F40PH-2C 1050 wrote:so it is going to take a year to just build an incline ramp?And incorporate the connection to the viaduct, which isn't as easy as it sounds with the Leverett Connector and heavily driven roads right below the connection. I am of the belief that the line will in fact be completed earlier than one year, only thing holding off the opening being a schedule change and the start of summer when ridership patterns shift.