by carajul
A new 3 mast signal bridge has been installed over the remaining tracks at Lehighton Intl. Looks awesome! The new signals NS installed along the CNJ ramp in 2010 are being replaced with yet another new signal mast!
Also the lone single mast signal along the tacks in front of where the shop building was located has been completely painted white and a sign with "A" on it has been placed just under the signal aspect.
What on earth is NS up to???
Also the lone single mast signal along the tacks in front of where the shop building was located has been completely painted white and a sign with "A" on it has been placed just under the signal aspect.
What on earth is NS up to???