by David Benton
The Christchurch to Greymouth rail link will be closed for at least six weeks after a 300-hectare fire damaged rail infrastructure during Waitangi weekend.
http://www.stuff.co.nz/national/8913971 ... -six-weeks" onclick="window.open(this.href);return false;
THis means all South Island rail services are out of action, after the Kaikoura earthquake closed the Coastal Pacific route for up to a year.
http://www.stuff.co.nz/national/8913971 ... -six-weeks" onclick="window.open(this.href);return false;
THis means all South Island rail services are out of action, after the Kaikoura earthquake closed the Coastal Pacific route for up to a year.
Moderator worldwide railfan , Rail travel & trip reports
The only train trips I regret are the ones I didn't take.
The only train trips I regret are the ones I didn't take.